Our Experiences
|
No |
Name of Project |
Service Category |
Client |
Year |
| 120. | Project Management Consultant for Site Preparation, Material Procurement and Civil Works on EPC Project for Regasification Facility Development in Tarakan | Project Management Consultancy | PT PLN Energi Gas | 2024 |
| 119. | Master Station Replacement Study to Prepare the SCADA and Automation System Strategy | Feasibility Study | PT PLN Batam | 2024 |
| 118. | Feasibility Study Mini LNG and Regasification Unit in East and Central Java | Feasibility Study | Petrogas Jatim Utama | 2024 |
| 117. | Engineering, Procurement and Installation of Diesel Dual Fuel Engine for 3-Phase Marine Vessel Engine | EPC Services | ITS – National Ship Design & Engineering Center (NASDEC) | 2024 |
| 116. | Development of Prototype for Diesel to Gas Engine Conversion for Marine Vessel | Engineering Services | ITS – National Ship Design & Engineering Center (NASDEC) | 2024 |
| 115. | Gas Monitoring IT System Development and Implementation | Engineering Services | Husky-CNOOC Madura Limited | 2024 |
| 114. | Feasibility Study for Onshore and Offshore Gas Pipeline from Panaran to Kabil and Kabil to Bintan Island | Feasibility Study | PT PLN Batam | 2024 |
| 113. | Pengadaan Battery Energy System Storage 110 KW | Procurement Services | PT PLN Persero | 2024 |
| 112. | Pengadaan Kendaraan Berbahan Bakar Hydrogen – Hyundai Nexo | Procurement Services | PT PLN Suku Cadang | 2024 |
| 111. | Feasibility Study of Kampung Satu & Binalutung Gasification Project | Feasibility Study | PT PLN Energi Gas | 2024 |
| 110. | Review Detailed Engineering Design Fasilitas Regasifikasi LNG Gn. Belah, Tarakan | Engineering Services | PT PLN Energi Gas | 2024 |
| 109. | Pendampingan Lelang Proyek Onshore Gas Facility untuk Pembangkit ITC Huadi Punagaya | Bid Doc/Tender Consultancy | PT PLN Energi Gas | 2024 |
| 108. | Hazard Identification Study for Onshore Gas Facility Development in Punagaya | HAZID/HAZOP | PT PLN Energi Gas | 2024 |
| 107. | Assessment Jetty Existing for Gasification Tanjung Selor Power Plant | Assessment Services | PT PLN Energi Gas | 2024 |
| 106. | Feasibility Study for Gasifikasi Kampung Satu | Feasibility Study | PT PLN Energi Gas | 2024 |
| 105. | Engineering Estimate for Onshore Gas Facility Punagaya | Engineering Services | PT PLN Energi Gas | 2024 |
| 104. | Engineering Estimate for Gasifikasi Tanjung Selor | Engineering Services | PT PLN Energi Gas | 2024 |
| 103. | Engineering Estimate for Gasifikasi Tarakan | Engineering Services | PT PLN Energi Gas | 2024 |
| 102. | Front End Engineering Design Document for Punagaya Offshore and Onshore Gas Pipeline | Engineering Services | PT PLN Energi Gas | 2024 |
| 101. | Additional FEED Document for Tarakan to Kampung Baru Gas Pipeline | Engineering Services | PT PLN Energi Gas | 2024 |
| 100. | Project Due Diligence and Feasibility Study for Krakatau Steel Logistic Services | Due Diligence & Feasibility Study | PT Pertamina International Shipping | 2024 |
| 99. | Project Due Diligence, Feasibility Study and Bid Doc Review for FPSO Kikeh, Malaysia | Due Diligence, Feasibility Study & Bid Doc Consultancy | PT Pertamina International Shipping | 2024 |
| 98. | Business Due Diligence and Feasibility Study for Establishment of JV Company with Chandra Asri | Due Diligence & Feasibility Study | PT Pertamina International Shipping | 2024 |
| 97. | Feasibility Study for LNG Carrier and FSRU Tsing-shan, Morowali | Feasibility Study | PT Pertamina International Shipping | 2024 |
| 96. | Review Design Engineering and Gas Flow Calculation for Gresik – Semarang Gas Pipeline | Engineering Services | PT Pertamina Gas | 2024 |
| 95. | Project Management and Supervision for Boiler Reparation of FRU Lumbung Dewata | PMC Services | PT Pelindo Energi Logistik | 2024 |
| 94. | Assessment of Gas Boiler Reparation for FRU Lumbung Dewata | EPCC Services | PT Pelindo Energi Logistik | 2024 |
| 93. | Kajian Komersialisasi dan Keekonomian Mini LNG untuk Pasar Retail sebagai Substitusi LPG | Feasibility Study | SKK Migas | 2024 |
| 92. | Kajian Komersialisasi dan Keekonomian Gas Bumi Menjadi Produk Petrokimia Turunan | Feasibility Study | SKK Migas | 2024 |
| 91. | Kajian Komersialisasi dan Keekonomian Pengembangan Gas Bumi untuk Optimasi Produksi LPG | Feasibility Study | SKK Migas | 2024 |
| 90. | Feasibility Study for LNG Infrastructures Development in North Papua Cluster | Feasibility Study | PT Pertamina International Shipping | 2024 |
| 89. | Feasibility Study of Barge Mounted Power Plant for 200 kW Electric Generation in South Sulawesi | Feasibility Study | PT Pertamina International Shipping | 2024 |
| 88. | Pengadaan dan Upgrading Hydrogen Refueling Station di PLTD Senayan | EPCC Services | PT PLN Suku Cadang & PT PLN Indonesia Power | 2024 |
| 87. | Konsultasi Pekerjaan Soil Test & Topography dan Penyusunan Dokumen FEED Fasilitas Penyimpanan, Transportasi & Regasifikasi untuk Gasifikasi Pembangkit Tanjung Selor | Soil Investigation & Engineering Services | PT PLN Energi Gas | 2024 |
| 86. | Konsultasi Pekerjaan Soil Test & Topography dan Penyusunan Dokumen FEED Fasilitas Penyimpanan, Transportasi & Regasifikasi untuk Gasifikasi Pembangkit Tarakan | Soil Investigation & Engineering Services | PT PLN Energi Gas | 2024 |
| 85. | Bankable Feasibility Study of LNG/Gas to Power for 50 MW Gas Turbine Power Station Upgrading at Kunidi, Port Moresby, Papua New Guinea | Feasibility Study | PNG Power Limited | 2023 |
| 84. | Engineering Estimate & Owner Estimate for Gas to Power Infrastructure and Supply Chain Development in Nias, Nusa Tenggara, Sulawesi-Maluku and North Papua Cluster | Engineering Services | PT RINA Indonesia | 2023 |
| 83. | Studi Kelayakan Pengembangan Mobile Barge Sea Water Reverse Osmosis 10,000 m3/day Muara Baru untuk Pasokan Air Bersih di Wilayah Jakarta Utara | Feasibility Study | PT Mitra Adhya Listrindo | 2023 |
| 82. | Studi Market Gas di Jawa Timur dan Jawa Tengah | Feasibility Study | Husky CNOOC Madura Limited | 2023 |
| 81. | Konsultan Legal dan Komersial untuk Investasi Pembangkit Listrik Tenaga Gas Uap Gorontalo | Legal Consultancy | PT PLN Nusantara Power | 2023 |
| 80. | Konsultan Teknis Pemilihan Penyedia Pembangkit Listrik Tenaga Mesin Gas 600 MW dan Infrastruktur LNG untuk Tiga Lokasi di Pulau Sulawesi dengan Skema Build Operate Own (BOO) | Bid Doc Consultancy | PT PLN Batam | 2023 |
| 79. | Pengadaan Parts dan Jasa Pondasi dan Instalasi Hydrogen Fuel Cell Generator | EPCC Services | PT PLN Suku Cadang | 2023 |
| 78. | LNG Value Chain Expert Training | Expert Training / Education | Korea Indonesia Offshore Research Cooperation Center | 2023 |
| 77. | Study of Customs, Local Content And Import/Export Requirements For Parts In The Shipbuilding And Offshore Sector | Legal Consultancy – Regulation Study | Korea Indonesia Offshore Research Cooperation Center | 2023 |
| 76. | Jasa Pekerjaan Studi Konseptual Terhadap Floating Storage Unit (FSU) & Landbased Regasification LNG Terminal Bali | Feasibility Study | PT Dewata Energi Bersih | 2023 |
| 75. | Jasa Konsultan Penyusunan Dokumen Desain (Detailed Engineering Design) Untuk Pekerjaan Pembangunan Tangki Timbun Beserta Penataan Terminal Curah Cair Di TTS-01 Semarang |
Engineering Services | PT Pelindo Energi Logistik | 2023 |
| 74. | Assesment dan Supervisi Perbaikan Boiler | Operation & Maintenance | PT Pelindo Energi Logistik | 2023 |
| 73. | Pre-FEED, Financial Modeling and Business Advisory for Bengkulu LPG Terminal Work | Feasibility Study & Engineering Services | PT APCA Tirta Engineering | 2023 |
| 72. | Jasa Penyusunan Dokumen FEED dan Penyusunan Dokumen Lelang Untuk Pekerjaan Pembangunan Tangki di Semarang | Engineering Services | PT Pelindo Energi Logistik | 2023 |
| 71. | Studi Market Gas dengan Impurities Tinggi dan Stranded Area di Jawa Barat Zona 7 Regional 2 | Feasibility Study | PT Pertamina EP | 2023 |
| 70. | Design Engineering dan Instalasi Converter Kits Hydrogen untuk Diesel Genset Menjadi DDF Hydrogen | Engineering Services | PT Patcom Hydrogen International | 2023 |
| 69. | Feasibility Study untuk Pengembangan dan Pengelolaan Sumur Tua di Daerah Kabupaten PALI | Feasibility Study | PT Patcom Energi Indonesia | 2023 |
| 68. | Laporan Audit Energi | Energy Audit | PT Nusa Halmahera Minerals | 2023 |
| 67. | Kajian Perubahan atas Peraturan BPH Migas no 34/2019 serta Penerapan Dual Toll Fee (TF) pada Ruas Pipa Transmisi Gas Gresik-Semarang (GRESEM) yang Single Line di PT Pertamina Gas | Regulation Study | PT Pertamina Training & Consulting | 2023 |
| 66. | Jasa Konsultan Penyusunan Asset Integrity and Reability Management Terminal LNG | Asset Integrity Management | PT Pelindo Energi Logistik | 2023 |
| 65. | Jasa Engineering untuk desain konversi boiler dan theral hot oil dan LNG Pressure Regulation system untuk PT Perhutani pine chemical industry di Pemalang Jateng | Engineering Services | PT Pasopati Energi Indonesia | 2023 |
| 64. | Jasa Konsultansi Kajian Rencana Implementasi Distribusi LNG dari Fasilitas LNG Arun untuk Pelanggan Industri Lainnya di Luar Sektor Kelistrikan Wilayah Sumatera Utara dan Sekitarnya Menggunakan Isotank, Tabung Vertical Gas Liquid, Atau lainnya | Feasibility Study | Sucofindo – PLN Energi Primer Indonesia | 2023 |
| 63. | Jasa Study Komersialisasi Gas dan Design Engineering untuk Gas Treatment di Lapangan Gas Jawa Barat | Feasibility Study | P2M UI - PT Pertamina EP | 2023 |
| 62. | Jasa Konsultan Teknis dan Komersial untuk Pengembangan Bisnis LNG Bunkering | Feasibility Study | PT Pelindo Energi Logistik | 2023 |
| 61. | Jasa Konsultan Teknis untuk Penyusunan Asumsi Parameter Teknis pada Dokumen Pengadaan Proyek Gasifikasi melalui Penyediaan Midstream Gas | Consultancy and Engineering Services | PLN Energi Primer Indonesia | 2023 |
| 60. | Kajian Perubahan atas Peraturan BPH Migas no 34/2019 serta Penerapan Dual Toll Fee (TF) pada Ruas Pipa Transmisi Gas Gresik-Semarang (GRESEM) yang Single Line di PT Pertamina Gas | Feasibility Study | PTC – Pertamina Gas | 2022 |
| 59. | Jasa Konsultan Penyusunan Asset Integrity and Reability Management untuk FRU Benoa | Asset Integrity Management | PT Pelindo Energi Logistik | 2022 |
| 58. | Pre FEED and Engineering Estimate for 1 MMSCFD Demak Mini LNG Plant | Engineering Service | PT Pertamina Gas | 2022 |
| 57. | Project Management Consultant Project Penambahan Volume (Upgrading) CNG Plant KHT, Indramayu | Project Management Consultant | PT Reethau Dharma Andalan | 2022 |
| 56. | Konsultan/Lembaga Engineering untuk project Penambahan Volume (Upgrading) CNG Plant KHT, Indramayu | Engineering Service | PT Reethau Dharma Andalan | 2022 |
| 55. | Jasa Kajian Rencana Komersialisasi Gas Bumi Area Kutai Barat, Area Kerendan dan Arean Seram | Feasibility Study | P2M FTUI - SKK MIGAS | 2022 |
| 54. | Pekerjaan Review FEED, Re-Engineering dan Legal Review Fase II pada Pembangunan Land Based LNG Terminal Bali | Engineering Service and Legal Consultancy | PT Dewata Energi Bersih | 2022 |
| 53. | Study of Development of Liquefied Natural Gas Infrastructure In Indonesia | Feasibility Study | Korea Maritime And Ocean University Consortium (KMOUC) | 2022 |
| 52. | Kajian Pengembangan Usaha Sektor Niaga LNG PT Perta Arun Gas Wilayah Provinsi Aceh | Feasibility Study | PT Pertamina Training & Consulting | 2022 |
| 51. | Layanan Atas Jasa Konsultan di Bidang Minyak dan Gas Bumi | Consultancy | PT AKR Corporindo Tbk | 2022 |
| 50. | Feasibility Study pada Fuel Oil & LPG Storage Station Tanjung Api Api, Banyuasin, Palembang-Sumatera Selatan | Feasibility Study | PT Dutapro Energi Utama | 2022 |
| 49. | EPPCI and O&M untuk Pressure Reducing System (PRS) dan Metering System untuk CNG PT Purnama Tirta Tex | EPPCI and Operation & Maintenance | PT Pasopati Energi Indonesia | 2022 |
| 48. | EPPCI and O&M untuk Shelter dan Gas Piping System PT Purnama Tirtatex | EPPCI and Operation & Maintenance | PT Pasopati Energi Indonesia | 2022 |
| 47. | Repair, Installation and Commissioning of LNG Vaporizer for PT PEL’s FRU | Engineering & Maintenance Services | PT Benoa Gas Terminal | 2022 |
| 46. | Jasa Konsultan Kajian Safety & Operability Relokasi Terminal LNG Benoa | Consultancy and Engineering Services | PT Pelindo Energi Logistik | 2021 |
| 45. | Pre FEED and Engineering Estimate for 7 MMSCFD Meruap Mini LNG Plant and LNG Trucking to Scattered Customer | Engineering Service | PT Pasopati Energi Indonesia – PT PGN (Persero) Tbk | 2021 |
| 44. | Consultation Services for Business Support License Acquisition from ESDM Migas & PT Pertamina | License/Permit Acquisition | PT Ciber Properti Indonesia | 2021 |
| 43. | Pengadaan Jasa Pekerjaan Uji Coba Proyek Pemanfaatan LNG Untuk Aplikasi DDF (Diesel Dual Fuel) Kereta Pembangkit PT Kereta Api Indonesia (Persero) | EPCC | P2M UI - PT PGN LNG Indonesia | 2021 |
| 42. | Jasa Project Management Consultant Pekerjaan Mechanical, Electrical, Piping dan Instrumentasi Rokan | Project Management Consultant | PT Maharani Prima | 2021 |
| 41. | Jasa Konsultan Technical & Commercial Proposal Gas Trading Business Support | Consultancy | PT Isma Asia Indotama | 2021 |
| 40. | Jasa Konsultan Penyusunan Proposal Teknis dan Komersial untuk Transportasi dan Layanan Regasifikasi LNG Stage 1 Proyek PLTMG PT PGN | Consultancy and Engineering Services | PT Adhi Karya (Persero) Tbk | 2021 |
| 39. | Konsultan Pengawas Pelaksanaan Investasi (KPPI) Proyek Pembangunan Pipa Tambak Rejo – Tambak Lorok Jawa Tengah untuk BPH MIGAS | Consultancy (KPPI) | PT Pertamina Gas | 2021 |
| 38. | Jasa Engineering untuk desain konversi thermal hot oil boiler dan CNG Pressure Regulation System untuk PT Perhutani Pine Chemical Industry, Pemalang, Jateng | Engineering Services | PT Pasopati Energi Indonesia | 2020 |
| 37. | Jasa Penyusunan FS dan FEED Bio CNG dari limbah cair pabrik kelapa sawit (POME) CT Agro di Kalimantan Selatan | Feasibility Study & Engineering Services | CT Agro | 2020 |
| 36. | Project Management Consultant (PMC) pada Pekerjaan Jasa Konstruksi Pemasangan Instalasi Pipa Minyak Blok Rokan beserta Fasilitas Pendukungnya Segmen 6B dan 11B | Project Management Consultant | PT Cemerlang Samudera Konstrindo | 2020 |
| 35. | Engineering Document Support untuk Tender EPC Penggantian Pipa Minyak Blok Rokan | Engineering Service | PT Cemerlang Samudera Konstrindo | 2020 |
| 34. | Project Management Consultant of Cepu Receiving Facility and Piping System | Project Management Consultant | PT Drajat Alam Raya Semesta - Pegasol | 2020 |
| 33. | Engineering Design of LPG Mercaptan Removal | Engineering Service | PT Bhakti Mingas Utama | 2020 |
| 32. | Study Pemodelan Material Balance Kilang Green Gasoline | Engineering Service | P3Tek - EBTKE | 2019 |
| 31. | Feasility Study of Biodiesel Plant – Muara Wahau, East Kalimantan | Feasibility Study | PT Dharma Satya Nusantara | 2019 |
| 30. | Project Management Consultant for Natural Gas Networks for Households in Kab. Mojokerto and Kota Mojokerto | Project Management Consultant | Ditjen MIGAS, Ministry of E&MR | 2019 |
| 29. | Project Management Consultant for Natural Gas Networks for Households in Kab. Lamongan and Kab. Kutai Kertanegara | Project Management Consultant | Ditjen MIGAS, Ministry of E&MR | 2019 |
| 28. | Project Management Consultant for Natural Gas Networks for Households in Kab. Cirebon, Kab. Karawang and Kab. Purwakarta | Project Management Consultant | Ditjen MIGAS, Ministry of E&MR | 2019 |
| 27. | Study on Regulation and Business Model of the Small-Scale LNG Transportation through ISO Tank Trucking and Railways System | Feasibility Study | Indonesia Oil & Gas Research Center (LEMIGAS) | 2020 |
| 26. | Design Calculation and Financial Modelling for LNG Supply, Logistic Model and Regassification Plant for Nickel Smelter in Kabaena, South East Sulawesi | Feasibility Study | PT Aggreko Indonesia | 2019 |
| 25. | Permits Acquisition Assistance and Workshop Design for Pertamina’s LPG Agent in Sungai Hulu Utara Regency | License/Permit Acquisition | PT Berkah Anugrah Utama | 2019 |
| 24. | Performance Study Heater Treater | Engineering Service | PT Odira Energy Karang Agung | 2019 |
| 23. | Pre-Startup Safety Review Service LNG Regasification | Engineering Service | PT DPS Group | 2018 |
| 22. | Evaluasi Performa Condensate Stabilizer Package | Engineering Service | PT Pertamina EP | 2018 |
| 21. | CFD Simulation for Static Cooler (Conoco Phillips) | Engineering Service | PT Surya Besindo Sakti | 2018 |
| 20. | HAZOP & HAZID Study – Semberah LNG Regasification | HAZOP/HAZID | WCP-BRE KONSORSIUM | 2017 |
| 19. | Feasibility Study of CPO Mill – Sulawesi Tengah | Feasibility Study | PT Korea Development Co. Ltd | 2017 |
| 18. | Project Management Consultant of Communal Solar Power Plant Maluku Tengah, Maluku Province | Project Management Consultant | Ditjen PKT, Kementerian Desa dan Transmigrasi | 2016 |
| 17. | Project Management Consultant of Communal Solar Power Plants Development in Lampung and West Kalimantan | Project Management Consultant | Ditjen PKT, Kementerian Desa dan Transmigrasi | 2016 |
| 16. | Feasibility Study on Small Scale LNG Shipping & Receiving Terminal in Bangka Island | Feasibility Study | PT DPS Group | 2016 |
| 15. | Heater Treater Process Engineering Design | Engineering Service | PT Flaris Energy | 2016 |
| 14. | CFD Simulation For Deliquidizer Santos Offshore | Engineering Service | PT Synergy Engineering | 2016 |
| 13. | Startup-Commisioning – Medco Simenggaris Gas Plant | Commissioning | PT Ravindo Putra Mandiri | 2015 |
| 12. | Heater Treater Process Engineering Design | Engineering Service | PT Timas Suplindo | 2015 |
| 11. | HAZOP & HAZID Study – Senipah Power Plant | HAZOP/HAZID | PT KPM OG | 2015 |
| 10. | HAZOP & HAZID Study – Pipeline Batam Power Plant | HAZOP/HAZID | PT Siwics Metakompresi | 2015 |
| 9. | HAZOP & HAZID Study – SPBG Kp. Melayu | HAZOP/HAZID | PT Torindo | 2015 |
| 8. | HAZOP & HAZID Study – SPBG Plumpang | HAZOP/HAZID | PT Illamaru Jaya | 2015 |
| 7. | Study on the National Oil Fuel Supply and Distribution Infrastructure Development Master Plan | Feasibility Study | BPH MIGAS | 2015 |
| 6. | Study on Formula of Distribution Costs and Margins of Fuel Supply and Distribution. | Feasibility Study | BPH MIGAS | 2014 |
| 5. | HAZOP & HAZID Study – CNG Peaker Bangkanai | HAZOP/HAZID | PT Timas Suplindo | 2014 |
| 4. | HAZOP & HAZID Study – JATA LPG Plant – Muba | HAZOP/HAZID | PT Hokasa Mandiri | 2014 |
| 3. | HAZOP & HAZID Study – Pipeline Onshore Receiving | HAZOP/HAZID | PT Siwics Metakompresi | 2013 |
| 2. | Energy Audit & Document Preparation ISO 50001 | Energy Audit | PT Sinarmas Agro | 2013 |
| 1. | 3 Kg of Subsidized LPG Users Survey and Identification in Kalimantan Region | Consultancy | Ditjen MIGAS, Ministry of E&MR | 2013 |