Our Experiences
Our Experiences
No |
Name of Project |
Service Category |
Client |
Year |
1. |
3 Kg of Subsidized LPG
Users Survey and Identification in Kalimantan Region |
Consultancy |
Ditjen MIGAS, Ministry of
E&MR |
2013 |
2. |
Energy Audit &
Document Preparation ISO 50001 |
Energy Audit |
PT Sinarmas Agro |
2013 |
3. |
HAZOP & HAZID Study –
Pipeline Onshore Receiving |
HAZOP/HAZID |
PT Siwics Metakompresi |
2013 |
4. |
HAZOP & HAZID Study –
JATA LPG Plant – Muba |
HAZOP/HAZID |
PT Hokasa Mandiri |
2014 |
5. |
HAZOP & HAZID Study –
CNG Peaker Bangkanai |
HAZOP/HAZID |
PT Timas Suplindo |
2014 |
6. |
Study on Formula of
Distribution Costs and Margins of Fuel Supply and Distribution. |
Feasibility Study |
BPH MIGAS |
2014 |
7. |
Study on the National Oil
Fuel Supply and Distribution Infrastructure Development Master Plan |
Feasibility Study |
BPH MIGAS |
2015 |
8. |
HAZOP & HAZID Study –
SPBG Plumpang |
HAZOP/HAZID |
PT Illamaru Jaya |
2015 |
9. |
HAZOP & HAZID Study –
SPBG Kp. Melayu |
HAZOP/HAZID |
PT Torindo |
2015 |
10. |
HAZOP & HAZID Study –
Pipeline Batam Power Plant |
HAZOP/HAZID |
PT Siwics Metakompresi |
2015 |
11. |
HAZOP & HAZID Study –
Senipah Power Plant |
HAZOP/HAZID |
PT KPM OG |
2015 |
12. |
Heater Treater Process
Engineering Design |
Engineering Service |
PT Timas Suplindo |
2015 |
13. |
Startup-Commisioning –
Medco Simenggaris Gas Plant |
Commissioning |
PT Ravindo Putra Mandiri |
2015 |
14. |
CFD Simulation For
Deliquidizer Santos Offshore |
Engineering Service |
PT Synergy Engineering |
2016 |
15. |
Heater Treater Process
Engineering Design |
Engineering Service |
PT Flaris Energy |
2016 |
16. |
Feasibility Study on Small
Scale LNG Shipping & Receiving Terminal in Bangka Island |
Feasibility Study |
PT DPS Group |
2016 |
17. |
Project Management
Consultant of Communal Solar Power Plants Development in Lampung and West
Kalimantan |
Project Management
Consultant |
Ditjen PKT, Kementerian
Desa dan Transmigrasi |
2016 |
18. |
Project Management
Consultant of Communal Solar Power Plant Maluku Tengah, Maluku Province |
Project Management
Consultant |
Ditjen PKT, Kementerian
Desa dan Transmigrasi |
2016 |
19. |
Feasibility Study of CPO
Mill – Sulawesi Tengah |
Feasibility Study |
PT Korea Development Co.
Ltd |
2017 |
20. |
HAZOP & HAZID Study –
Semberah LNG Regasification |
HAZOP/HAZID |
WCP-BRE KONSORSIUM |
2017 |
21. |
CFD Simulation for Static
Cooler (Conoco Phillips) |
Engineering Service |
PT Surya Besindo Sakti |
2018 |
22. |
Evaluasi Performa
Condensate Stabilizer Package |
Engineering Service |
PT Pertamina EP |
2018 |
23. |
Pre-Startup Safety Review
Service LNG Regasification |
Engineering Service |
PT DPS Group |
2018 |
24. |
Performance Study Heater
Treater |
Engineering Service |
PT Odira Energy Karang
Agung |
2019 |
25. |
Permits Acquisition
Assistance and Workshop Design for Pertamina’s LPG Agent in Sungai Hulu Utara
Regency |
License/Permit Acquisition |
PT Berkah Anugrah Utama |
2019 |
26. |
Design Calculation and
Financial Modelling for LNG Supply, Logistic Model and Regassification Plant
for Nickel Smelter in Kabaena, South East Sulawesi |
Feasibility Study |
PT Aggreko Indonesia |
2019 |
27. |
Study on Regulation and
Business Model of the Small-Scale LNG Transportation through ISO Tank
Trucking and Railways System |
Feasibility Study |
Indonesia Oil & Gas
Research Center (LEMIGAS) |
2020 |
28. |
Project Management
Consultant for Natural Gas Networks for Households in Kab. Cirebon, Kab.
Karawang and Kab. Purwakarta |
Project Management
Consultant |
Ditjen MIGAS, Ministry of
E&MR |
2019 |
29. |
Project Management
Consultant for Natural Gas Networks for Households in Kab. Lamongan and Kab.
Kutai Kertanegara |
Project Management
Consultant |
Ditjen MIGAS, Ministry of
E&MR |
2019 |
30. |
Project Management
Consultant for Natural Gas Networks for Households in Kab. Mojokerto and Kota
Mojokerto |
Project Management
Consultant |
Ditjen MIGAS, Ministry of
E&MR |
2019 |
31. |
Feasility Study of
Biodiesel Plant – Muara Wahau, East Kalimantan |
Feasibility Study |
PT Dharma Satya Nusantara |
2019 |
32. |
Study Pemodelan Material
Balance Kilang Green Gasoline |
Engineering Service |
P3Tek - EBTKE |
2019 |
33. |
Engineering Design of LPG
Mercaptan Removal |
Engineering Service |
PT Bhakti Mingas Utama |
2020 |
34. |
Project Management
Consultant of Cepu Receiving Facility and Piping System |
Project Management
Consultant |
PT Drajat Alam Raya Semesta - Pegasol |
2020 |
35. |
Engineering Document
Support untuk Tender EPC Penggantian Pipa Minyak Blok Rokan |
Engineering Service |
PT Cemerlang Samudera
Konstrindo |
2020 |
36. |
Project Management
Consultant (PMC) pada Pekerjaan Jasa Konstruksi Pemasangan Instalasi Pipa
Minyak Blok Rokan beserta Fasilitas Pendukungnya Segmen 6B dan 11B |
Project Management
Consultant |
PT Cemerlang Samudera
Konstrindo |
2020 |
37. |
Jasa Penyusunan FS dan
FEED Bio CNG dari limbah cair pabrik kelapa sawit (POME) CT Agro di
Kalimantan Selatan |
Feasibility Study &
Engineering Services |
CT Agro |
2020 |
38. |
Jasa Engineering untuk
desain konversi thermal hot oil boiler dan CNG Pressure Regulation System
untuk PT Perhutani Pine Chemical Industry, Pemalang, Jateng |
Engineering Services |
PT Pasopati Energi
Indonesia |
2020 |
39. |
Konsultan Pengawas
Pelaksanaan Investasi (KPPI) Proyek Pembangunan Pipa Tambak Rejo – Tambak
Lorok Jawa Tengah untuk BPH MIGAS |
Consultancy (KPPI) |
PT Pertamina Gas |
2021 |
40. |
Jasa Konsultan Penyusunan
Proposal Teknis dan Komersial untuk Transportasi dan Layanan Regasifikasi LNG
Stage 1 Proyek PLTMG PT PGN |
Consultancy and
Engineering Services |
PT Adhi Karya (Persero)
Tbk |
2021 |
41. |
Jasa Konsultan Technical
& Commercial Proposal Gas Trading Business Support |
Consultancy |
PT Isma Asia Indotama |
2021 |
42. |
Jasa Project Management
Consultant Pekerjaan Mechanical, Electrical, Piping dan Instrumentasi Rokan |
Project Management
Consultant |
PT Maharani Prima |
2021 |
43. |
Pengadaan Jasa Pekerjaan
Uji Coba Proyek Pemanfaatan LNG Untuk Aplikasi DDF (Diesel Dual Fuel) Kereta
Pembangkit PT Kereta Api Indonesia (Persero) |
EPCC |
P2M UI - PT PGN LNG
Indonesia |
2021 |
44. |
Consultation Services for
Business Support License Acquisition from ESDM Migas & PT Pertamina |
License/Permit Acquisition |
PT Ciber Properti
Indonesia |
2021 |
45. |
Pre FEED and Engineering
Estimate for 7 MMSCFD Meruap Mini LNG Plant and LNG Trucking to Scattered
Customer |
Engineering Service |
PT Pasopati Energi Indonesia – PT PGN (Persero) Tbk |
2021 |
46. |
Jasa Konsultan Kajian Safety & Operability Relokasi Terminal LNG
Benoa |
Consultancy and
Engineering Services |
PT Pelindo Energi Logistik |
2021 |
47. |
Repair, Installation and
Commissioning of LNG Vaporizer for PT PEL’s FRU |
Engineering &
Maintenance Services |
PT Benoa Gas Terminal |
2022 |
48. |
EPPCI and O&M untuk
Shelter dan Gas Piping System PT Purnama Tirtatex |
EPPCI and Operation &
Maintenance |
PT Pasopati Energi
Indonesia |
2022 |
49. |
EPPCI and O&M untuk
Pressure Reducing System (PRS) dan Metering System untuk CNG PT Purnama Tirta
Tex |
EPPCI and Operation &
Maintenance |
PT Pasopati Energi
Indonesia |
2022 |
50. |
Feasibility Study pada
Fuel Oil & LPG Storage Station Tanjung Api Api, Banyuasin,
Palembang-Sumatera Selatan |
Feasibility Study |
PT Dutapro Energi Utama |
2022 |
51. |
Layanan Atas Jasa Konsultan di Bidang Minyak dan Gas Bumi |
Consultancy |
PT AKR Corporindo Tbk |
2022 |
52. |
Kajian Pengembangan Usaha
Sektor Niaga LNG PT Perta Arun Gas Wilayah Provinsi Aceh |
Feasibility Study |
PT Pertamina Training
& Consulting |
2022 |
53. |
Study of Development of
Liquefied Natural Gas Infrastructure In Indonesia |
Feasibility Study |
Korea Maritime And Ocean
University Consortium (KMOUC) |
2022 |
54. |
Pekerjaan Review FEED,
Re-Engineering dan Legal Review Fase II pada Pembangunan Land Based LNG
Terminal Bali |
Engineering Service and
Legal Consultancy |
PT Dewata Energi Bersih |
2022 |
55. |
Jasa Kajian Rencana Komersialisasi
Gas Bumi Area Kutai Barat, Area Kerendan dan Arean Seram |
Feasibility Study |
P2M FTUI - SKK MIGAS |
2022 |
56. |
Konsultan/Lembaga
Engineering untuk project Penambahan Volume (Upgrading) CNG Plant KHT,
Indramayu |
Engineering Service |
PT Reethau Dharma Andalan |
2022 |
57. |
Project Management
Consultant Project Penambahan Volume (Upgrading) CNG Plant KHT, Indramayu |
Project Management
Consultant |
PT Reethau Dharma Andalan |
2022 |
58. |
Pre FEED and Engineering
Estimate for 1 MMSCFD Demak Mini LNG Plant |
Engineering Service |
PT Pertamina Gas |
2022 |
59. |
Jasa Konsultan Penyusunan
Asset Integrity and Reability Management untuk FRU Benoa |
Asset Integrity Management |
PT Pelindo Energi Logistik |
2022 |
60. |
Kajian Perubahan atas
Peraturan BPH Migas no 34/2019 serta Penerapan Dual Toll Fee (TF) pada Ruas
Pipa Transmisi Gas Gresik-Semarang (GRESEM) yang Single Line di PT Pertamina
Gas |
Feasibility Study |
PTC – Pertamina Gas |
2022 |
61. |
Jasa Konsultan Teknis
untuk Penyusunan Asumsi Parameter Teknis pada Dokumen Pengadaan Proyek
Gasifikasi melalui Penyediaan Midstream Gas |
Consultancy and
Engineering Services |
PLN Energi Primer
Indonesia |
2023 |
62. |
Jasa Konsultan Teknis dan Komersial untuk Pengembangan Bisnis LNG
Bunkering |
Feasibility Study |
PT Pelindo Energi Logistik |
2023 |
63. |
Jasa Study Komersialisasi
Gas dan Design Engineering untuk Gas Treatment di Lapangan Gas Jawa Barat |
Feasibility Study |
P2M UI - PT Pertamina EP |
2023 |
64. |
Jasa Konsultansi Kajian
Rencana Implementasi Distribusi LNG dari Fasilitas LNG Arun untuk Pelanggan
Industri Lainnya di Luar Sektor Kelistrikan Wilayah Sumatera Utara dan
Sekitarnya Menggunakan Isotank, Tabung Vertical Gas Liquid, Atau lainnya |
Feasibility Study |
Sucofindo – PLN Energi
Primer Indonesia |
2023 |
65. |
Jasa Engineering untuk
desain konversi boiler dan theral hot oil dan LNG Pressure Regulation system
untuk PT Perhutani pine chemical industry di Pemalang Jateng |
Engineering Services |
PT Pasopati Energi
Indonesia |
2023 |
66. |
Jasa Konsultan Penyusunan
Asset Integrity and Reability Management Terminal LNG |
Asset Integrity Management |
PT Pelindo Energi Logistik |
2023 |
67. |
Kajian Perubahan atas
Peraturan BPH Migas no 34/2019 serta Penerapan Dual Toll Fee (TF) pada Ruas
Pipa Transmisi Gas Gresik-Semarang (GRESEM) yang Single Line di PT Pertamina
Gas |
Regulation Study |
PT Pertamina Training
& Consulting |
2023 |
68. |
Laporan Audit Energi |
Energy Audit |
PT Nusa Halmahera Minerals |
2023 |
69. |
Feasibility Study untuk
Pengembangan dan Pengelolaan Sumur Tua di Daerah Kabupaten PALI |
Feasibility Study |
PT Patcom Energi Indonesia |
2023 |
70. |
Design Engineering dan
Instalasi Converter Kits Hydrogen untuk Diesel Genset Menjadi DDF Hydrogen |
Engineering Services |
PT Patcom Hydrogen
International |
2023 |
71. |
Studi Market Gas dengan
Impurities Tinggi dan Stranded Area di Jawa Barat Zona 7 Regional 2 |
Feasibility Study |
PT Pertamina EP |
2023 |
72. |
Jasa Penyusunan Dokumen
FEED dan Penyusunan Dokumen Lelang Untuk Pekerjaan Pembangunan Tangki di
Semarang |
Engineering Services |
PT Pelindo Energi Logistik |
2023 |
73. |
Pre-FEED, Financial
Modeling and Business Advisory for Bengkulu LPG Terminal Work |
Feasibility Study &
Engineering Services |
PT APCA Tirta Engineering |
2023 |
74. |
Assesment dan Supervisi
Perbaikan Boiler |
Operation &
Maintenance |
PT Pelindo Energi Logistik |
2023 |
75. |
Jasa Konsultan Penyusunan
Dokumen Desain (Detailed Engineering Design) Untuk Pekerjaan
Pembangunan Tangki Timbun Beserta Penataan Terminal Curah Cair Di TTS-01
Semarang |
Engineering Services |
PT Pelindo Energi Logistik |
2023 |
76. |
Jasa Pekerjaan Studi
Konseptual Terhadap Floating Storage Unit (FSU) & Landbased
Regasification LNG Terminal Bali |
Feasibility Study |
PT Dewata Energi Bersih |
2023 |
77. |
Study of Customs, Local
Content And Import/Export Requirements For Parts In The Shipbuilding And
Offshore Sector |
Legal Consultancy –
Regulation Study |
Korea Indonesia Offshore
Research Cooperation Center |
2023 |
78. |
LNG Value Chain Expert
Training |
Expert Training /
Education |
Korea Indonesia Offshore
Research Cooperation Center |
2023 |
79. |
Pengadaan Parts dan Jasa
Pondasi dan Instalasi Hydrogen Fuel Cell Generator |
EPCC Services |
PT PLN Suku Cadang |
2023 |
80. |
Konsultan Teknis Pemilihan
Penyedia Pembangkit Listrik Tenaga Mesin Gas 600 MW dan Infrastruktur LNG
untuk Tiga Lokasi di Pulau Sulawesi dengan Skema Build Operate Own (BOO) |
Bid Doc Consultancy |
PT PLN Batam |
2023 |
81. |
Konsultan Legal dan
Komersial untuk Investasi Pembangkit Listrik Tenaga Gas Uap Gorontalo |
Legal Consultancy |
PT PLN Nusantara Power |
2023 |
82. |
Studi Market Gas di Jawa
Timur dan Jawa Tengah |
Feasibility Study |
Husky CNOOC Madura Limited |
2023 |
83. |
Studi Kelayakan
Pengembangan Mobile Barge Sea Water Reverse Osmosis 10,000 m3/day Muara Baru
untuk Pasokan Air Bersih di Wilayah Jakarta Utara |
Feasibility Study |
PT Mitra Adhya Listrindo |
2023 |
84. |
Engineering Estimate &
Owner Estimate for Gas to Power Infrastructure and Supply Chain Development
in Nias, Nusa Tenggara, Sulawesi-Maluku and North Papua Cluster |
Engineering Services |
PT RINA Indonesia |
2023 |
85. |
Bankable Feasibility Study
of LNG/Gas to Power for 50 MW Gas Turbine Power Station Upgrading at Kunidi,
Port Moresby, Papua New Guinea |
Feasibility Study |
PNG Power Limited |
2023 |
86. |
Konsultasi Pekerjaan Soil
Test & Topography dan Penyusunan Dokumen FEED Fasilitas Penyimpanan,
Transportasi & Regasifikasi untuk Gasifikasi Pembangkit Tarakan |
Soil Investigation &
Engineering Services |
PT PLN Energi Gas |
2024 |
87. |
Konsultasi Pekerjaan Soil
Test & Topography dan Penyusunan Dokumen FEED Fasilitas Penyimpanan,
Transportasi & Regasifikasi untuk Gasifikasi Pembangkit Tanjung Selor |
Soil Investigation &
Engineering Services |
PT PLN Energi Gas |
2024 |
88. |
Pengadaan dan Upgrading
Hydrogen Refueling Station di PLTD Senayan |
EPCC Services |
PT PLN Suku Cadang &
PT PLN Indonesia Power |
2024 |
89. |
Feasibility Study of Barge
Mounted Power Plant for 200 kW Electric Generation in South Sulawesi |
Feasibility Study |
PT Pertamina International
Shipping |
2024 |
90. |
Feasibility Study for LNG
Infrastructures Development in North Papua Cluster |
Feasibility Study |
PT Pertamina International
Shipping |
2024 |
91. |
Kajian Komersialisasi dan
Keekonomian Pengembangan Gas Bumi untuk Optimasi Produksi LPG |
Feasibility Study |
SKK Migas |
2024 |
92. |
Kajian Komersialisasi dan
Keekonomian Gas Bumi Menjadi Produk Petrokimia Turunan |
Feasibility Study |
SKK Migas |
2024 |
93. |
Kajian Komersialisasi dan
Keekonomian Mini LNG untuk Pasar Retail sebagai Substitusi LPG |
Feasibility Study |
SKK Migas |
2024 |
94. |
Assessment of Gas Boiler
Reparation for FRU Lumbung Dewata |
EPCC Services |
PT Pelindo Energi Logistik |
2024 |
95. |
Project Management and
Supervision for Boiler Reparation of FRU Lumbung Dewata |
PMC Services |
PT Pelindo Energi Logistik |
2024 |
96. |
Review Design Engineering
and Gas Flow Calculation for Gresik – Semarang Gas Pipeline |
Engineering Services |
PT Pertamina Gas |
2024 |
97. |
Feasibility Study for LNG
Carrier and FSRU Tsing-shan, Morowali |
Feasibility Study |
PT Pertamina International
Shipping |
2024 |
98. |
Business Due Diligence and
Feasibility Study for Establishment of JV Company with Chandra Asri |
Due Diligence &
Feasibility Study |
PT Pertamina International
Shipping |
2024 |
99. |
Project Due Diligence,
Feasibility Study and Bid Doc Review for FPSO Kikeh, Malaysia |
Due Diligence, Feasibility
Study & Bid Doc Consultancy |
PT Pertamina International
Shipping |
2024 |
100. |
Project Due Diligence and
Feasibility Study for Krakatau Steel Logistic Services |
Due Diligence &
Feasibility Study |
PT Pertamina International
Shipping |
2024 |
101. |
Additional FEED Document
for Tarakan to Kampung Baru Gas Pipeline |
Engineering Services |
PT PLN Energi Gas |
2024 |
102. |
Front End Engineering
Design Document for Punagaya Offshore and Onshore Gas Pipeline |
Engineering Services |
PT PLN Energi Gas |
2024 |
103. |
Engineering Estimate for
Gasifikasi Tarakan |
Engineering Services |
PT PLN Energi Gas |
2024 |
104. |
Engineering Estimate for
Gasifikasi Tanjung Selor |
Engineering Services |
PT PLN Energi Gas |
2024 |
105. |
Engineering Estimate for
Onshore Gas Facility Punagaya |
Engineering Services |
PT PLN Energi Gas |
2024 |
106. |
Feasibility Study for
Gasifikasi Kampung Satu |
Feasibility Study |
PT PLN Energi Gas |
2024 |
107. |
Assessment Jetty Existing
for Gasification Tanjung Selor Power Plant |
Assessment Services |
PT PLN Energi Gas |
2024 |
108. |
Hazard Identification
Study for Onshore Gas Facility Development in Punagaya |
HAZID/HAZOP |
PT PLN Energi Gas |
2024 |
109. |
Pendampingan Lelang Proyek
Onshore Gas Facility untuk Pembangkit ITC Huadi Punagaya |
Bid Doc/Tender Consultancy |
PT PLN Energi Gas |
2024 |
110. |
Review Detailed
Engineering Design Fasilitas Regasifikasi LNG Gn. Belah, Tarakan |
Engineering Services |
PT PLN Energi Gas |
2024 |
111. |
Feasibility Study of
Kampung Satu & Binalutung Gasification Project |
Feasibility Study |
PT PLN Energi Gas |
2024 |
112. |
Pengadaan Kendaraan
Berbahan Bakar Hydrogen – Hyundai Nexo |
Procurement Services |
PT PLN Suku Cadang |
2024 |
113. |
Pengadaan Battery Energy
System Storage 110 KW |
Procurement Services |
PT PLN Persero |
2024 |
114. |
Feasibility Study for
Onshore and Offshore Gas Pipeline from Panaran to Kabil and Kabil to Bintan
Island |
Feasibility Study |
PT PLN Batam |
2024 |
115. |
Gas Monitoring IT System
Development and Implementation |
Engineering Services |
Husky-CNOOC Madura Limited |
2024 |
116. |
Development of Prototype
for Diesel to Gas Engine Conversion for Marine Vessel |
Engineering Services |
ITS – National Ship Design
& Engineering Center (NASDEC) |
2024 |
117. |
Engineering, Procurement
and Installation of Diesel Dual Fuel Engine for 3-Phase Marine Vessel Engine |
EPC Services |
ITS – National Ship Design
& Engineering Center (NASDEC) |
2024 |
118. |
Feasibility Study Mini LNG
and Regasification Unit in East and Central Java |
Feasibility Study |
Petrogas Jatim Utama |
2024 |
119. |
Master Station Replacement
Study to Prepare the SCADA and Automation System Strategy |
Feasibility Study |
PT PLN Batam |
2024 |
120. |
Project Management
Consultant for Site Preparation, Material Procurement and Civil Works on EPC
Project for Regasification Facility Development in Tarakan |
Project Management Consultancy |
PT PLN Energi Gas |
2024 |
121. |
Project Management Consultant
for Mechanical, Electrical, Instrumentation Installation & Completion on
EPC Project for Regasification Facility Development in Tarakan |
Project Management Consultancy |
PT PLN Energi Gas |
2024 |
122. |
Feasibility Study of Gas
Swap Arrangement for Batam Gas Supply & Demand Related to Electricity
Development |
Feasibility Study |
PT PLN Batam |
2025 |
123. |
Engineering Design &
Training for Diesel Dual Fuel by Using Hydrogen for Tug Boat Vessel |
Engineering Services &
Training |
PT Pelayaran Bahtera
Adhiguna |
2025 |
124. |
Engineering Service &
Construction Procedure Development for Tarakan LNG Regasification Plant |
Engineering Services |
PT PLN Nusantara Power
Construction |
2025 |
125. |
Front End Engineering
Design for Civil & Structural Infrastructure Development in Nusa Tenggara
Cluster |
Engineering Services |
PT RINA Indonesia |
2025 |
126. |
Front End Engineering
Design for LNG Regasification Infrastructure Development of Jeranjang |
Engineering Services |
PT RINA Indonesia |
2025 |
127. |
Design Services for LCT
Modification to ISO Tank LNG Carrier |
Engineering Services |
PT PLN Energi Gas |
2025 |
128. |
LNG Transport Route
Evaluation and Strategic Recommendations at Tanjung Selor River |
Assessment Services |
PT PLN Energi Gas |
2025 |
129. |
Front End Engineering
Design – Onshore Gas Pipeline – Panaran to Kabil |
Engineering Services |
PT PLN Batam |
2025 |
130. |
Engineering Estimate –
Onshore Gas Pipeline – Panaran to Kabil |
Engineering Services |
PT PLN Batam |
2025 |
131. |
Bid Doc Consultancy –
Onshore Gas Pipeline – Panaran to Kabil |
Bid Doc Consultancy |
PT PLN Batam |
2025 |