Our Experiences
Our Experiences
| No | Name of Project | Service Category | Client | Year | 
| 1. | 3 Kg of Subsidized LPG
  Users Survey and Identification in Kalimantan Region | Consultancy | Ditjen MIGAS, Ministry of
  E&MR | 2013 | 
| 2. | Energy Audit &
  Document Preparation ISO 50001 | Energy Audit | PT Sinarmas Agro | 2013 | 
| 3. | HAZOP & HAZID Study –
  Pipeline Onshore Receiving | HAZOP/HAZID | PT Siwics Metakompresi | 2013 | 
| 4. | HAZOP & HAZID Study –
  JATA LPG Plant – Muba | HAZOP/HAZID | PT Hokasa Mandiri | 2014 | 
| 5. | HAZOP & HAZID Study –
  CNG Peaker Bangkanai | HAZOP/HAZID | PT Timas Suplindo | 2014 | 
| 6. | Study on Formula of
  Distribution Costs and Margins of Fuel Supply and Distribution. | Feasibility Study | BPH MIGAS | 2014 | 
| 7. | Study on the National Oil
  Fuel Supply and Distribution Infrastructure Development Master Plan | Feasibility Study | BPH MIGAS | 2015 | 
| 8. | HAZOP & HAZID Study –
  SPBG Plumpang | HAZOP/HAZID | PT Illamaru Jaya | 2015 | 
| 9. | HAZOP & HAZID Study –
  SPBG Kp. Melayu | HAZOP/HAZID | PT Torindo | 2015 | 
| 10. | HAZOP & HAZID Study –
  Pipeline Batam Power Plant | HAZOP/HAZID | PT Siwics Metakompresi | 2015 | 
| 11. | HAZOP & HAZID Study –
  Senipah Power Plant | HAZOP/HAZID | PT KPM OG | 2015 | 
| 12. | Heater Treater Process
  Engineering Design | Engineering Service | PT Timas Suplindo | 2015 | 
| 13. | Startup-Commisioning –
  Medco Simenggaris Gas Plant | Commissioning | PT Ravindo Putra Mandiri | 2015 | 
| 14. | CFD Simulation For
  Deliquidizer Santos Offshore | Engineering Service | PT Synergy Engineering | 2016 | 
| 15. | Heater Treater Process
  Engineering Design | Engineering Service | PT Flaris Energy | 2016 | 
| 16. | Feasibility Study on Small
  Scale LNG Shipping & Receiving Terminal in Bangka Island | Feasibility Study | PT DPS Group | 2016 | 
| 17. | Project Management
  Consultant of Communal Solar Power Plants Development in Lampung and West
  Kalimantan | Project Management
  Consultant | Ditjen PKT, Kementerian
  Desa dan Transmigrasi | 2016 | 
| 18. | Project Management
  Consultant of Communal Solar Power Plant Maluku Tengah, Maluku Province | Project Management
  Consultant | Ditjen PKT, Kementerian
  Desa dan Transmigrasi | 2016 | 
| 19. | Feasibility Study of CPO
  Mill – Sulawesi Tengah | Feasibility Study | PT Korea Development Co.
  Ltd | 2017 | 
| 20. | HAZOP & HAZID Study –
  Semberah LNG Regasification | HAZOP/HAZID | WCP-BRE KONSORSIUM | 2017 | 
| 21. | CFD Simulation for Static
  Cooler (Conoco Phillips) | Engineering Service | PT Surya Besindo Sakti | 2018 | 
| 22. | Evaluasi Performa
  Condensate Stabilizer Package | Engineering Service | PT Pertamina EP | 2018 | 
| 23. | Pre-Startup Safety Review
  Service LNG Regasification | Engineering Service | PT DPS Group | 2018 | 
| 24. | Performance Study Heater
  Treater | Engineering Service | PT Odira Energy Karang
  Agung | 2019 | 
| 25. | Permits Acquisition
  Assistance and Workshop Design for Pertamina’s LPG Agent in Sungai Hulu Utara
  Regency | License/Permit Acquisition | PT Berkah Anugrah Utama | 2019 | 
| 26. | Design Calculation and
  Financial Modelling for LNG Supply, Logistic Model and Regassification Plant
  for Nickel Smelter in Kabaena, South East Sulawesi | Feasibility Study | PT Aggreko Indonesia | 2019 | 
| 27. | Study on Regulation and
  Business Model of the Small-Scale LNG Transportation through ISO Tank
  Trucking and Railways System | Feasibility Study | Indonesia Oil & Gas
  Research Center (LEMIGAS) | 2020 | 
| 28. | Project Management
  Consultant for Natural Gas Networks for Households in Kab. Cirebon, Kab.
  Karawang and Kab. Purwakarta | Project Management
  Consultant | Ditjen MIGAS, Ministry of
  E&MR | 2019 | 
| 29. | Project Management
  Consultant for Natural Gas Networks for Households in Kab. Lamongan and Kab.
  Kutai Kertanegara | Project Management
  Consultant | Ditjen MIGAS, Ministry of
  E&MR | 2019 | 
| 30. | Project Management
  Consultant for Natural Gas Networks for Households in Kab. Mojokerto and Kota
  Mojokerto | Project Management
  Consultant | Ditjen MIGAS, Ministry of
  E&MR | 2019 | 
| 31. | Feasility Study of
  Biodiesel Plant – Muara Wahau, East Kalimantan | Feasibility Study | PT Dharma Satya Nusantara | 2019 | 
| 32. | Study Pemodelan Material
  Balance Kilang Green Gasoline | Engineering Service | P3Tek - EBTKE | 2019 | 
| 33. | Engineering Design of LPG
  Mercaptan Removal | Engineering Service | PT Bhakti Mingas Utama | 2020 | 
| 34. | Project Management
  Consultant of Cepu Receiving Facility and Piping System | Project Management
  Consultant | PT Drajat Alam Raya Semesta - Pegasol | 2020 | 
| 35. | Engineering Document
  Support untuk Tender EPC Penggantian Pipa Minyak Blok Rokan | Engineering Service | PT Cemerlang Samudera
  Konstrindo | 2020 | 
| 36. | Project Management
  Consultant (PMC) pada Pekerjaan Jasa Konstruksi Pemasangan Instalasi Pipa
  Minyak Blok Rokan beserta Fasilitas Pendukungnya Segmen 6B dan 11B | Project Management
  Consultant | PT Cemerlang Samudera
  Konstrindo | 2020 | 
| 37. | Jasa Penyusunan FS dan
  FEED Bio CNG dari limbah cair pabrik kelapa sawit  (POME) CT Agro di
  Kalimantan Selatan | Feasibility Study &
  Engineering Services | CT Agro | 2020 | 
| 38. | Jasa Engineering untuk
  desain konversi thermal hot oil boiler dan CNG Pressure Regulation System
  untuk PT Perhutani Pine Chemical Industry, Pemalang, Jateng | Engineering Services | PT Pasopati Energi
  Indonesia | 2020 | 
| 39. | Konsultan Pengawas
  Pelaksanaan Investasi (KPPI) Proyek Pembangunan Pipa Tambak Rejo – Tambak
  Lorok Jawa Tengah untuk BPH MIGAS | Consultancy (KPPI) | PT Pertamina Gas | 2021 | 
| 40. | Jasa Konsultan Penyusunan
  Proposal Teknis dan Komersial untuk Transportasi dan Layanan Regasifikasi LNG
  Stage 1 Proyek PLTMG PT PGN | Consultancy and
  Engineering Services | PT Adhi Karya (Persero)
  Tbk | 2021 | 
| 41. | Jasa Konsultan Technical
  & Commercial Proposal Gas Trading Business Support | Consultancy | PT Isma Asia Indotama | 2021 | 
| 42. | Jasa Project Management
  Consultant Pekerjaan Mechanical, Electrical, Piping dan Instrumentasi Rokan | Project Management
  Consultant | PT Maharani Prima | 2021 | 
| 43. | Pengadaan Jasa Pekerjaan
  Uji Coba Proyek Pemanfaatan LNG Untuk Aplikasi DDF (Diesel Dual Fuel) Kereta
  Pembangkit PT Kereta Api Indonesia (Persero) | EPCC | P2M UI - PT PGN LNG
  Indonesia | 2021 | 
| 44. | Consultation Services for
  Business Support License Acquisition from ESDM Migas & PT Pertamina | License/Permit Acquisition | PT Ciber Properti
  Indonesia | 2021 | 
| 45. | Pre FEED and Engineering
  Estimate for 7 MMSCFD Meruap Mini LNG Plant and LNG Trucking to Scattered
  Customer | Engineering Service | PT Pasopati Energi Indonesia – PT PGN (Persero) Tbk | 2021 | 
| 46. | Jasa Konsultan Kajian Safety & Operability Relokasi Terminal LNG
  Benoa | Consultancy and
  Engineering Services | PT Pelindo Energi Logistik | 2021 | 
| 47. | Repair, Installation and
  Commissioning of LNG Vaporizer for PT PEL’s FRU | Engineering &
  Maintenance Services | PT Benoa Gas Terminal | 2022 | 
| 48. | EPPCI and O&M untuk
  Shelter dan Gas Piping System PT Purnama Tirtatex | EPPCI and Operation &
  Maintenance | PT Pasopati Energi
  Indonesia | 2022 | 
| 49. | EPPCI and O&M untuk
  Pressure Reducing System (PRS) dan Metering System untuk CNG PT Purnama Tirta
  Tex | EPPCI and Operation &
  Maintenance | PT Pasopati Energi
  Indonesia | 2022 | 
| 50. | Feasibility Study pada
  Fuel Oil & LPG Storage Station Tanjung Api Api, Banyuasin,
  Palembang-Sumatera Selatan | Feasibility Study | PT Dutapro Energi Utama | 2022 | 
| 51. | Layanan Atas Jasa Konsultan di Bidang Minyak dan Gas Bumi | Consultancy | PT AKR Corporindo Tbk | 2022 | 
| 52. | Kajian Pengembangan Usaha
  Sektor Niaga LNG PT Perta Arun Gas Wilayah Provinsi Aceh | Feasibility Study | PT Pertamina Training
  & Consulting | 2022 | 
| 53. | Study of Development of
  Liquefied Natural Gas Infrastructure In Indonesia | Feasibility Study | Korea Maritime And Ocean
  University Consortium (KMOUC) | 2022 | 
| 54. | Pekerjaan Review FEED,
  Re-Engineering dan Legal Review Fase II pada Pembangunan Land Based LNG
  Terminal Bali | Engineering Service and
  Legal Consultancy | PT Dewata Energi Bersih | 2022 | 
| 55. | Jasa Kajian Rencana Komersialisasi
  Gas Bumi Area Kutai Barat, Area Kerendan dan Arean Seram | Feasibility Study | P2M FTUI - SKK MIGAS | 2022 | 
| 56. | Konsultan/Lembaga
  Engineering untuk project Penambahan Volume (Upgrading) CNG Plant KHT,
  Indramayu | Engineering Service | PT Reethau Dharma Andalan | 2022 | 
| 57. | Project Management
  Consultant Project Penambahan Volume (Upgrading) CNG Plant KHT, Indramayu | Project Management
  Consultant | PT Reethau Dharma Andalan | 2022 | 
| 58. | Pre FEED and Engineering
  Estimate for 1 MMSCFD Demak Mini LNG Plant | Engineering Service | PT Pertamina Gas | 2022 | 
| 59. | Jasa Konsultan Penyusunan
  Asset Integrity and Reability Management untuk FRU Benoa | Asset Integrity Management | PT Pelindo Energi Logistik | 2022 | 
| 60. | Kajian Perubahan atas
  Peraturan BPH Migas no 34/2019 serta Penerapan Dual Toll Fee (TF) pada Ruas
  Pipa Transmisi Gas Gresik-Semarang (GRESEM) yang Single Line di PT Pertamina
  Gas | Feasibility Study | PTC – Pertamina Gas | 2022 | 
| 61. | Jasa Konsultan Teknis
  untuk Penyusunan Asumsi Parameter Teknis pada Dokumen Pengadaan Proyek
  Gasifikasi melalui Penyediaan Midstream Gas | Consultancy and
  Engineering Services | PLN Energi Primer
  Indonesia | 2023 | 
| 62. | Jasa Konsultan Teknis dan Komersial untuk Pengembangan Bisnis LNG
  Bunkering | Feasibility Study | PT Pelindo Energi Logistik | 2023 | 
| 63. | Jasa Study Komersialisasi
  Gas dan Design Engineering untuk Gas Treatment di Lapangan Gas Jawa Barat | Feasibility Study | P2M UI - PT Pertamina EP | 2023 | 
| 64. | Jasa Konsultansi Kajian
  Rencana Implementasi Distribusi LNG dari Fasilitas LNG Arun untuk Pelanggan
  Industri Lainnya di Luar Sektor Kelistrikan Wilayah Sumatera Utara dan
  Sekitarnya Menggunakan Isotank, Tabung Vertical Gas Liquid, Atau lainnya | Feasibility Study | Sucofindo – PLN Energi
  Primer Indonesia | 2023 | 
| 65. | Jasa Engineering untuk
  desain konversi boiler dan theral hot oil dan LNG Pressure Regulation system
  untuk PT Perhutani pine chemical industry di Pemalang Jateng | Engineering Services | PT Pasopati Energi
  Indonesia | 2023 | 
| 66. | Jasa Konsultan Penyusunan
  Asset Integrity and Reability Management Terminal LNG | Asset Integrity Management | PT Pelindo Energi Logistik | 2023 | 
| 67. | Kajian Perubahan atas
  Peraturan BPH Migas no 34/2019 serta Penerapan Dual Toll Fee (TF) pada Ruas
  Pipa Transmisi Gas Gresik-Semarang (GRESEM) yang Single Line di PT Pertamina
  Gas | Regulation Study | PT Pertamina Training
  & Consulting | 2023 | 
| 68. | Laporan Audit Energi | Energy Audit | PT Nusa Halmahera Minerals | 2023 | 
| 69. | Feasibility Study untuk
  Pengembangan dan Pengelolaan Sumur Tua di Daerah Kabupaten PALI | Feasibility Study | PT Patcom Energi Indonesia | 2023 | 
| 70. | Design Engineering dan
  Instalasi Converter Kits Hydrogen untuk Diesel Genset Menjadi DDF Hydrogen | Engineering Services | PT Patcom Hydrogen
  International | 2023 | 
| 71. | Studi Market Gas dengan
  Impurities Tinggi dan Stranded Area di Jawa Barat Zona 7 Regional 2 | Feasibility Study | PT Pertamina EP | 2023 | 
| 72. | Jasa Penyusunan Dokumen
  FEED dan Penyusunan Dokumen Lelang Untuk Pekerjaan Pembangunan Tangki di
  Semarang | Engineering Services | PT Pelindo Energi Logistik | 2023 | 
| 73. | Pre-FEED, Financial
  Modeling and Business Advisory for Bengkulu LPG Terminal Work | Feasibility Study &
  Engineering Services | PT APCA Tirta Engineering | 2023 | 
| 74. | Assesment dan Supervisi
  Perbaikan Boiler | Operation &
  Maintenance  | PT Pelindo Energi Logistik | 2023 | 
| 75. | Jasa Konsultan Penyusunan
  Dokumen Desain (Detailed Engineering Design) Untuk Pekerjaan
  Pembangunan Tangki Timbun Beserta Penataan Terminal Curah Cair Di TTS-01
  Semarang | Engineering Services | PT Pelindo Energi Logistik | 2023 | 
| 76. | Jasa Pekerjaan Studi
  Konseptual Terhadap Floating Storage Unit (FSU) & Landbased
  Regasification LNG Terminal Bali | Feasibility Study | PT Dewata Energi Bersih | 2023 | 
| 77. | Study of Customs, Local
  Content And Import/Export Requirements For Parts In The Shipbuilding And
  Offshore Sector | Legal Consultancy –
  Regulation Study | Korea Indonesia Offshore
  Research Cooperation Center | 2023 | 
| 78. | LNG Value Chain Expert
  Training | Expert Training /
  Education | Korea Indonesia Offshore
  Research Cooperation Center | 2023 | 
| 79. | Pengadaan Parts dan Jasa
  Pondasi dan Instalasi Hydrogen Fuel Cell Generator | EPCC Services | PT PLN Suku Cadang | 2023 | 
| 80. | Konsultan Teknis Pemilihan
  Penyedia Pembangkit Listrik Tenaga Mesin Gas 600 MW dan Infrastruktur LNG
  untuk Tiga Lokasi di Pulau Sulawesi dengan Skema Build Operate Own (BOO) | Bid Doc Consultancy | PT PLN Batam | 2023 | 
| 81. | Konsultan Legal dan
  Komersial untuk Investasi Pembangkit Listrik Tenaga Gas Uap Gorontalo | Legal Consultancy | PT PLN Nusantara Power | 2023 | 
| 82. | Studi Market Gas di Jawa
  Timur dan Jawa Tengah | Feasibility Study | Husky CNOOC Madura Limited | 2023 | 
| 83. | Studi Kelayakan
  Pengembangan Mobile Barge Sea Water Reverse Osmosis 10,000 m3/day Muara Baru
  untuk Pasokan Air Bersih di Wilayah Jakarta Utara | Feasibility Study | PT Mitra Adhya Listrindo | 2023 | 
| 84. | Engineering Estimate &
  Owner Estimate for Gas to Power Infrastructure and Supply Chain Development
  in Nias, Nusa Tenggara, Sulawesi-Maluku and North Papua Cluster | Engineering Services | PT RINA Indonesia | 2023 | 
| 85. | Bankable Feasibility Study
  of LNG/Gas to Power for 50 MW Gas Turbine Power Station Upgrading at Kunidi,
  Port Moresby, Papua New Guinea | Feasibility Study | PNG Power Limited | 2023 | 
| 86. | Konsultasi Pekerjaan Soil
  Test & Topography dan Penyusunan Dokumen FEED Fasilitas Penyimpanan,
  Transportasi & Regasifikasi untuk Gasifikasi Pembangkit Tarakan | Soil Investigation &
  Engineering Services | PT PLN Energi Gas | 2024 | 
| 87. | Konsultasi Pekerjaan Soil
  Test & Topography dan Penyusunan Dokumen FEED Fasilitas Penyimpanan,
  Transportasi & Regasifikasi untuk Gasifikasi Pembangkit Tanjung Selor | Soil Investigation &
  Engineering Services | PT PLN Energi Gas | 2024 | 
| 88. | Pengadaan dan Upgrading
  Hydrogen Refueling Station di PLTD Senayan | EPCC Services | PT PLN Suku Cadang &
  PT PLN Indonesia Power | 2024 | 
| 89. | Feasibility Study of Barge
  Mounted Power Plant for 200 kW Electric Generation in South Sulawesi | Feasibility Study | PT Pertamina International
  Shipping | 2024 | 
| 90. | Feasibility Study for LNG
  Infrastructures Development in North Papua Cluster | Feasibility Study | PT Pertamina International
  Shipping | 2024 | 
| 91. | Kajian Komersialisasi dan
  Keekonomian Pengembangan Gas Bumi untuk Optimasi Produksi LPG | Feasibility Study | SKK Migas | 2024 | 
| 92. | Kajian Komersialisasi dan
  Keekonomian Gas Bumi Menjadi Produk Petrokimia Turunan | Feasibility Study | SKK Migas | 2024 | 
| 93. | Kajian Komersialisasi dan
  Keekonomian Mini LNG untuk Pasar Retail sebagai Substitusi LPG | Feasibility Study | SKK Migas | 2024 | 
| 94. | Assessment of Gas Boiler
  Reparation for FRU Lumbung Dewata | EPCC Services | PT Pelindo Energi Logistik | 2024 | 
| 95. | Project Management and
  Supervision for Boiler Reparation of FRU Lumbung Dewata | PMC Services | PT Pelindo Energi Logistik | 2024 | 
| 96. | Review Design Engineering
  and Gas Flow Calculation for Gresik – Semarang Gas Pipeline | Engineering Services | PT Pertamina Gas | 2024 | 
| 97. | Feasibility Study for LNG
  Carrier and FSRU Tsing-shan, Morowali | Feasibility Study | PT Pertamina International
  Shipping | 2024 | 
| 98. | Business Due Diligence and
  Feasibility Study for Establishment of JV Company with Chandra Asri | Due Diligence &
  Feasibility Study | PT Pertamina International
  Shipping | 2024 | 
| 99. | Project Due Diligence,
  Feasibility Study and Bid Doc Review for FPSO Kikeh, Malaysia | Due Diligence, Feasibility
  Study & Bid Doc Consultancy | PT Pertamina International
  Shipping | 2024 | 
| 100. | Project Due Diligence and
  Feasibility Study for Krakatau Steel Logistic Services | Due Diligence &
  Feasibility Study | PT Pertamina International
  Shipping | 2024 | 
| 101. | Additional FEED Document
  for Tarakan to Kampung Baru Gas Pipeline | Engineering Services | PT PLN Energi Gas | 2024 | 
| 102. | Front End Engineering
  Design Document for Punagaya Offshore and Onshore Gas Pipeline | Engineering Services | PT PLN Energi Gas | 2024 | 
| 103. | Engineering Estimate for
  Gasifikasi Tarakan | Engineering Services | PT PLN Energi Gas | 2024 | 
| 104. | Engineering Estimate for
  Gasifikasi Tanjung Selor | Engineering Services | PT PLN Energi Gas | 2024 | 
| 105. | Engineering Estimate for
  Onshore Gas Facility Punagaya | Engineering Services | PT PLN Energi Gas | 2024 | 
| 106. | Feasibility Study for
  Gasifikasi Kampung Satu | Feasibility Study | PT PLN Energi Gas | 2024 | 
| 107. | Assessment Jetty Existing
  for Gasification Tanjung Selor Power Plant | Assessment Services | PT PLN Energi Gas | 2024 | 
| 108. | Hazard Identification
  Study for Onshore Gas Facility Development in Punagaya | HAZID/HAZOP | PT PLN Energi Gas | 2024 | 
| 109. | Pendampingan Lelang Proyek
  Onshore Gas Facility untuk Pembangkit ITC Huadi Punagaya | Bid Doc/Tender Consultancy | PT PLN Energi Gas | 2024 | 
| 110. | Review Detailed
  Engineering Design Fasilitas Regasifikasi LNG Gn. Belah, Tarakan | Engineering Services | PT PLN Energi Gas | 2024 | 
| 111. | Feasibility Study of
  Kampung Satu & Binalutung Gasification Project | Feasibility Study | PT PLN Energi Gas | 2024 | 
| 112. | Pengadaan Kendaraan
  Berbahan Bakar Hydrogen – Hyundai Nexo | Procurement Services | PT PLN Suku Cadang | 2024 | 
| 113. | Pengadaan Battery Energy
  System Storage 110 KW | Procurement Services | PT PLN Persero | 2024 | 
| 114. | Feasibility Study for
  Onshore and Offshore Gas Pipeline from Panaran to Kabil and Kabil to Bintan
  Island | Feasibility Study | PT PLN Batam | 2024 | 
| 115. | Gas Monitoring IT System
  Development and Implementation | Engineering Services | Husky-CNOOC Madura Limited | 2024 | 
| 116. | Development of Prototype
  for Diesel to Gas Engine Conversion for Marine Vessel | Engineering Services | ITS – National Ship Design
  & Engineering Center (NASDEC) | 2024 | 
| 117. | Engineering, Procurement
  and Installation of Diesel Dual Fuel Engine for 3-Phase Marine Vessel Engine | EPC Services | ITS – National Ship Design
  & Engineering Center (NASDEC) | 2024 | 
| 118. | Feasibility Study Mini LNG
  and Regasification Unit in East and Central Java | Feasibility Study | Petrogas Jatim Utama | 2024 | 
| 119. | Master Station Replacement
  Study to Prepare the SCADA and Automation System Strategy | Feasibility Study | PT PLN Batam | 2024 | 
| 120. | Project Management
  Consultant for Site Preparation, Material Procurement and Civil Works on EPC
  Project for Regasification Facility Development in Tarakan | Project Management Consultancy | PT PLN Energi Gas | 2024 | 
| 121. | Project Management Consultant
  for Mechanical, Electrical, Instrumentation Installation & Completion on
  EPC Project for Regasification Facility Development in Tarakan | Project Management Consultancy | PT PLN Energi Gas | 2024 | 
| 122. | Feasibility Study of Gas
  Swap Arrangement for Batam Gas Supply & Demand Related to Electricity
  Development | Feasibility Study | PT PLN Batam | 2025 | 
| 123. | Engineering Design &
  Training for Diesel Dual Fuel by Using Hydrogen for Tug Boat Vessel | Engineering Services &
  Training | PT Pelayaran Bahtera
  Adhiguna | 2025 | 
| 124. | Engineering Service &
  Construction Procedure Development for Tarakan LNG Regasification Plant | Engineering Services | PT PLN Nusantara Power
  Construction | 2025 | 
| 125. | Front End Engineering
  Design for Civil & Structural Infrastructure Development in Nusa Tenggara
  Cluster | Engineering Services | PT RINA Indonesia | 2025 | 
| 126. | Front End Engineering
  Design for LNG Regasification Infrastructure Development of Jeranjang  | Engineering Services | PT RINA Indonesia | 2025 | 
| 127. | Design Services for LCT
  Modification to ISO Tank LNG Carrier  | Engineering Services | PT PLN Energi Gas | 2025 | 
| 128. | LNG Transport Route
  Evaluation and Strategic Recommendations at Tanjung Selor River | Assessment Services | PT PLN Energi Gas | 2025 | 
| 129. | Front End Engineering
  Design – Onshore Gas Pipeline – Panaran to Kabil | Engineering Services | PT PLN Batam | 2025 | 
| 130. | Engineering Estimate –
  Onshore Gas Pipeline – Panaran to Kabil | Engineering Services | PT PLN Batam | 2025 | 
| 131. | Bid Doc Consultancy –
  Onshore Gas Pipeline – Panaran to Kabil | Bid Doc Consultancy | PT PLN Batam | 2025 | 